Geothermal Energy

Our ongoing investment in Umurlu, Aydın has completed its geophysics studies in our licensed field and has five phases. It has a power capacity of 200 MW. The first phase investment with the capacity of 2x12 MW became operational in 2015, and 2016. The second phase investment with a power capacity of 120 MW is going on with its drilling work and is planned to become operational in 2018. With the other phases to become operational, it aims to increase the power capacity up to 200 MW until 2020. When the total capacity is reached, an annual production of 1.125 GWh worth of power will be generated based on geothermal resources.

 